IT Org Optimizer

Baseline Cost

$220M

Target

-25%

Projected Cost

$178M

Savings Achieved

$42M

Gap Remaining

$13M

Final Recommendations

Review and export your IT organization optimization plan

Balanced Scenario Selected
Executive Summary

Based on comprehensive analysis of your IT organization, we recommend implementing the Balanced scenario which achieves 19% cost reduction ($42M in savings) while maintaining acceptable risk levels. Key findings: • Current span of control (5.2) is below industry benchmark (6.0-7.0) • 28% vendor spend can be optimized through strategic insourcing and offshore migration • 8 overlapping capabilities identified across 15 teams present consolidation opportunities • Implementation timeline: 12-18 months with phased approach The recommended approach balances aggressive cost reduction with change management considerations, requiring 95 people moves and impacting 7 vendor contracts.

Key Moves

LeverDescriptionSavingsTiming
Org DesignIncrease span of control to 6.0 across delivery teams$2.08MQ1-Q2 2026
OutsourcingMigrate Application Support and QA Testing to TCS/Infosys$1.68MQ2 2026
InsourcingBring 35 vendor roles in-house at Krakow and Lisbon hubs$1.05MQ2-Q3 2026
RedundancyConsolidate Platform, Infrastructure, and DevOps teams$2.10MQ3 2026
RedundancyMerge overlapping BI and Analytics functions$1.40MQ4 2026

Export as PDF

Full executive report with charts

Export as PowerPoint

Board-ready presentation deck

Export as Excel

Detailed data and calculations